Development

  • 2020.06 Uyan studio was founded in Chongqing, China.
  • 2020.09 We designed several 10 keyboard schemes, and finally chose Tinker.
  • 2020.10 We determined the structure size through 3D printing, and improved step by step.
    • 2020.11 The first metal sample was made, but there were still some defects.
    • 2020.12 We changed a new manufacturing factory and finally got satisfactory metal samples. At the same time, we began to design the driving scheme for PCB.
    • 2021.01 We made satisfied samples and started group buying in China.
    • 2021.02 We started international group buying.
    • 2021.03 We have started the CNC manufacturing of the shell.
    • 2021.04 All parts have been produced, waiting for surface treatment and welding
    • 2021.05 We remanufactured the unqualified parts,finished part of the shell and began to produce packaging.